![]()
STANDARD EQUIPMENT OF A MODERATED PRESSURE MOBIL BOILER ROOM - GAS STEAM
HEATING PART
safety elements, steam fittings, operating pressure 12,2 bar, heat-delivery surface 189 m2, steam temperature 192 °C
WATER PART
chemical water treatment, automatic dosing, feed tank and pumps, fittings, feed water temperature 105 °C
FUEL PART
gas supply to the burner (natural gas or propane), gas pressure control, fuel emergency lock with gas pressure control RMG 330, fittings, gas pressure behind gas pressure control 5,0 kPa, automatics type KAH - RAY - TMG 740-2, gas equipment mobil boiler room KAH, slot burner RAY - UEN 3 SP-SL, rated power of a burner 5 350 kW, regulable power approximately
1 100 - 5 600 kW ( 1 600 - 8 000 kg steam / hour )
ELECTRICAL PART
steam pressure based control, lighting, 400 V / 230 V / 42 kW
OPERATION
continued attendance, possibility of remote control from control centre and PC visualization by request
CONTAINER
thermally uninsulated, blue color, possibility of own heating with own warm-air furnace, dimensions: length 9,35 ž 10 m - width 2,85 m - height 4,75 m, at the transport 3,7 m
SMOKE STACK
smoke stack DN 500 or 600 mm, 3 component stack ( stainless steel - heat insulation - aluminum ), high according at need up until 40 m, eventually steel self contained, approximately like high
BOILER
there is 1 pc of a steam boiler - KAH - BK 8,0 T 80 – producer CKD Dukla-Heidelberg with power 8 000 kg steam / hour
DOCUMENTATION
inspection books and proposed operating and maintenance rules are supplied with the boiler room
TECHNICAL CONDITIONS
GAS
gas inlet approximately 90 - 100 kPaCONDENSATE
return rate over 50%, temperature over 80°C
SLUDGE BLOW-OFF
automatic, eventually manual operation
CUSTOMER REQUIREMENTS
INQUIRY
in case you are interested in our services, send us a written inquiry - questionnaire for mobile boiler rooms
BASE
hard base has to be prepared that is able to bear approx. 25 to 30 tons (panels, ties, concrete footing)
TRANSPORT
we solving a transport and unloading of the boiler room, eventually a customer after the agreement
MEDIA
gas, heating medium, water and power connections to be solved by the customer, eventually we after the agreement
OTHER INFORMATION
RENTALS
have to be agreed individually according to the current usage of rented boiler rooms in the given period
SERVICE
in the Slovak Republic provided by CONUS Group, abroad provided by contractual partners

