Services Mobile boiler rooms Mobile boiler rooms - coal warm-water (for wood pellets also) Mobile boiler room equipment - coal warm-water
Slovenčina (Slovenská republika)English (United Kingdom)
Uvodný banner
START PAGE
Contacts
About us
Services
References
Awards
News
Partners
Contact us - QUESTIONNAIRE
Search
Map of website


 

Implementácia riešenia - www.ambja.sk

Mobile boiler room equipment - coal warm-water


STANDARD EQUIPMENT OF A MOBIL BOILER ROOM - COAL WARM-WATER ( for WOOD PELLETS also )

HEATING PART

max. operating pressure of 2 bar, mixing valve, expander, safety elements, pumps, fittings

WATER PART

water softening, automatic re-filling, max. operating pressure of 10 bar

FUEL PART

fuel storage in a one day hopper, automatic worm feeder as part of the boiler

ELECTRICAL PART

equithermal control, 1 mixing circuit, WSW heating control, lighting, grounding, 230 V / 5 kW

OPERATION

sporadic attendance, information on emergency conditions sent via GSM, possibility of remote PC visualization

CONTAINER

thermally insulated, light color, dimensions of approx. 5 to 7 m, height up to 3,3 m, fire resistence for 30 minutes

SMOKE STACK

6 meter high, self supporting, 3 component stack (stainless steel - heat insulation - aluminum)

BOILERS

there are always 2 pcs of steel EKO KOMFORT boilers – these are automatic boilers with a retort burner and automatic fuel dosing (from a hopper), with a combustion air fan that supports quality combustions, the boiler complies with strict European emission limits, boiler efficiency of 82 to 86%, max. output temperature of 80°C, the boiler automatically controls the stability of combustion

DOCUMENTATION

inspection books and proposed operating and maintenance rules are supplied with the boiler room


AUTOMATIZATION FEATURES FOR EXTRA CHARGE

COAL CHARGING

individual sollution – e.g. belt conveyors, chutes, etc.

ASH DISCHARGE

individual solution – e.g. by worm conveyor into an enclosed container

HEATING PART

max. operating pressure of 6 barwith a plate heat exchanger

WSW PREPARATION

WSW preparation rates can be added to a boiler or delivery separately to your needs

CUSTOMER REQUIREMENTS

INQUIRY

in case you are interested in our services, send us a written inquiry - questionnaire for mobile boiler rooms

BASE

hard base has to be prepared that is able to bear approx. 5 to 8 tons (panels, ties, concrete footing)

TRANSPORT

we solving a transport and unloading of the boiler room, eventually a customer after the agreement

MEDIA

fuel storage, heating medium, water and power connections to be solved by the customer, eventually we after the agreement

OTHER INFORMATION

RENTALS

have to be agreed individually according to the current usage of rented boiler rooms in the given period

SERVICE

in the Slovak Republic provided by CONUS Group, abroad provided by contractual partners

DELIVERY TIME

10 – 12 weeks

 
E-mail Print

© 2010 EUROCONUS
The copyright law applies to the content of this website. Euroconus s.r.o. took all adequate measures in order to prevent the virus transfer through this website and therefore refuses any responsibility for eventual loss or damage resulting from the defect of computer programs or electronic data of recipient as the consequence of eventual downloaded data from this website. We will not take responsibility for the information published by our collaboration companies on their own websites.