STANDARD EQUIPMENT OF A MOBIL BOILER ROOM - GAS STEAM
HEATING PART
safety elements, steam fittings, max. operating pressure of 8 bar
WATER PART
chemical water treatment, automatic dosing, feed tank and pumps, fittings, max. operating pressure of 10 bar
FUEL PART
gas supply to the burner, gas pressure control, fuel emergency lock, fittings, max. input pressure of 4 bar
ELECTRICAL PART
steam pressure based control, lighting, grounding, boiler rooms up to 600 kW - 230 V / 5 kW, boiler rooms over 600 kW - 380 V / 10 kW
OPERATION
sporadic attendance within 24 hours, information on emergency conditions sent via GSM, possibility of remote PC visualization
CONTAINER
thermally insulated, light color, dimensions of approx. 5 to 7 m, height up to 3,3 m, fire resistence for 30 minutes
SMOKE STACK
6 meter high, self supporting, 3 component stack (stainless steel - heat insulation - aluminum)
BOILERS
there is always 1 pc of a steam generator or 1 pc of a steam boiler - producered by LOOS
DOCUMENTATION
inspection books and proposed operating and maintenance rules are supplied with the boiler room
TECHNICAL CONDITIONS
CONDENSATE
return rate over 50%, temperature over 80°C
SLUDGE BLOW-OFF
automatic operation
SLAG DRAINAGE
automatic operation
WATER
water hardness for the chemical water treatment max 20°d (German grade)
CUSTOMER REQUIREMENTS
INQUIRY
in case you are interested in our services, send us a written inquiry - questionnaire for mobile boiler rooms
BASE
hard base has to be prepared that is able to bear approx. 5 to 8 tons (panels, ties, concrete footing)
TRANSPORT
we solving a transport and unloading of the boiler room, eventually a customer after the agreement
MEDIA
gas, heating medium, water and power connections to be solved by the customer, eventually we after the agreement
OTHER INFORMATION
RENTALS
have to be agreed individually according to the current usage of rented boiler rooms in the given period
SERVICE
in the Slovak Republic provided by CONUS Group, abroad provided by contractual partners
DELIVERY TIME
12 – 16 weeks – LOOS steam generators
16 – 20 weeks – steam-boilers LOOS
PROJECT DOCUMENTATION
in the even interest click here to project documentation