STANDARD EQUIPMENT OF A MOBIL BOILER ROOM - OIL WARM-WATER
HEATING PART
expander, safety elements, mixing valve, pumps, fittings, max. operating pressure of 6 bar
WATER PART
water softening, automatic re-filling, max. operating pressure of 10 bar
FUEL PART
oil storage - twin-shell tanks, oil supply to the burner, fuel emergency lock, fittings
ELECTRICAL PART
equithermal control, 1 mixing circuit, lighting, boiler rooms up to 600 kW - 230 V / 5 kW, boiler rooms over 600 kW - 380 V / 10 kW
OPERATION
sporadic attendance, information on emergency conditions sent via GSM, possibility of remote PC visualization
CONTAINER
thermally insulated, light color, dimensions of approx. 5 to 7 m, height up to 3,3 m, fire resistence for 30 minutes
SMOKE STACK
6 meter high, self supporting, 3 component stack (stainless steel - heat insulation - aluminum)
BOILERS – version 1
170 – 1300 kW - there are 2 pcs of boilers:
- 170 – 1 020 KW - cast iron ( with overpressure burners ) – producered by BUDERUS
- 1 300 kW - cast iron + steel ( with overpressure burners ) – producered by BUDERUS
BOILERS – version 2
over 1300 kW - there is 1 pc of a boiler (steel boiler with overpressure burners) – producered by LOOS, BUDERUS
DOCUMENTATION
inspection books and proposed operating and maintenance rules are supplied with the boiler room
OPTIONAL EQUIPMENT FOR EXTRA CHARGE
POWERS
type boiler room powers are selected according to the optimal composition of boilers, powers of the boiler rooms can be modified upon request
WSW PREPARATION
WSW preparation rates can be added to a boiler or delivery separately to your needs
RECOMMENDATION
we suggest to solve requirements for higher number of mixing circuits by placement of a distributor inside the building
HEAT GAUGES
the boiler room can be fitted with ultrasound heat gauges for the heat circuit and for the WSW preparation circuit
CUSTOMER REQUIREMENTS
INQUIRY
in case you are interested in our services, send us a written inquiry - questionnaire for mobile boiler rooms
BASE
hard base has to be prepared that is able to bear approx. 5 to 10 tons (panels, ties, concrete footing)
TRANSPORT
we solving a transport and unloading of the boiler room, eventually a customer after the agreement
MEDIA
oil, heating medium, water and power connections to be solved by the customer, eventually we after the agreement
OTHER INFORMATION
RENTALS
have to be agreed individually according to the current usage of rented boiler rooms in the given period
SERVICE
in the Slovak Republic provided by CONUS Group, abroad provided by contractual partners
DELIVERY TIME
10 – 12 weeks (Buderus boilers)
12 – 20 weeks (LOOS boilers)
PROJECT DOCUMENTATION
in the even interest click here to project documentation