STANDARD EQUIPMENT OF MOBIL BOILER ROOMS CONUS - GAS WARM-WATER

HEATING PART

expander, safety elements, mixing valve, pumps, fittings

max. operating pressure of 3 bar - condensing boilers

max. operating pressure of 6 bar - cast iron and steel boilers

WATER PART

water softening, automatic re-filling, max. operating pressure of 10 bar

FUEL PART

gas supply to the burner, gas pressure control, fuel emergency lock, fittings, max. input pressure of 4 bar

ELECTRICAL PART

equithermal control, 1 mixing circuit, WSW heating control, lighting, grounding, boiler rooms up to 600 kW - 230 V / 5 kW, boiler rooms over 600 kW - 380 V / 10 kW

OPERATION

sporadic attendance, information on emergency conditions sent via GSM, possibility of remote PC visualization

CONTAINER - 1 pc

thermally insulated, include a floor, rigid structure with stability for broken terrain, the tonnage is 26 tons, a floor is from laminated bamboo-wood or from steel with nonskud surface, blue color, a stacking 8 pcs, a length from 2 till 13 m, a width from 2 till 3 m, a height from 2 to 3,5 m, the best quality of lacker in worldmarket, fire resistence

SMOKE STACK

4 meter high, self supporting, 3 component stack (stainless steel - heat insulation - aluminum) - for overpressure boilers

4 meter high, self supporting, 3 component stack (plastic - heat insulation - aluminum) - for condensing boilers

BOILERS

there are different types of boilers, you can find here

DOCUMENTATION

inspection books and proposed operating and maintenance rules are supplied with the boiler room


OPTIONAL EQUIPMENT FOR EXTRA CHARGE

POWERS

type boiler room powers are selected according to the optimal composition of boilers, powers of the boiler rooms can be modified upon request

WSW PREPARATION

WSW preparation rates can be added to a boiler or delivery separately to your needs

RECOMMENDATION

we suggest to solve requirements for higher number of mixing circuits by placement of a distributor inside the building

HEAT GAUGES

the boiler room can be fitted with ultrasound heat gauges for the heat circuit and for the WSW preparation circuit

GAS METERS

the boiler room can be fitted by a gas meter or a gas re-calculator

CUSTOMER REQUIREMENTS

INQUIRY

in case you are interested in our services, send us a written inquiry - questionnaire for mobile boiler rooms CONUS

BASE

useful base has to be prepared hard but is it not necessary exactly level surface for our containers with weight approx. 5 till 30 tons - a standard hard level surface is adequate eventually only a concrete, an asphalt, a garth or panels, ties, concrete footing, etc. - it is not necessary a field engineering and it is saving of costs compared to past or to other containers

TRANSPORT

we solving a transport and unloading of the boiler room, eventually a customer after the agreement

MEDIA

gas, heating medium, water and power connections to be solved by the customer, eventually we after the agreement

OTHER INFORMATION

RENTALS

have to be agreed individually according to the current usage of rented boiler rooms in the given period

SERVICE

in the Slovak Republic and in the Czech Republic provided by CONUS Group, abroad provided by contractual partners

DELIVERY TIME

  1 -   3 weeks - BERGEN boilers
10 – 12 weeks - BUDERUS boilers
12 – 20 weeks - BOSCH boilers

PROJECT DOCUMENTATION

we provide an orientation project documentation for location of mobil boiler room in the event of interest