STANDARD EQUIPMENT OF MODERATED PRESSURE MOBIL BOILER ROOMS CONUS MKOD 8000 - GAS STEAM

HEATING PART

safety elements, steam fittings, operating pressure 12,2 bar, heat-delivery surface 189 m2, steam temperature 192 °C

WATER PART

chemical water treatment, automatic dosing, feed tank and pumps, fittings, feed water temperature 105 °C

FUEL PART

gas supply to the burner (natural gas or propane), gas pressure control, fuel emergency lock with gas pressure control RMG 330, fittings, gas pressure behind gas pressure control 5,0 kPa, automatics type KAH - RAY - TMG 740-2, gas equipment mobil boiler room KAH, slot burner RAY - UEN 3 SP-SL, rated power of a burner 5 350 kW, regulable power approximately 1 100 - 5 600 kW ( 1 600 - 8 000 kg steam / hour )

ELECTRICAL PART

steam pressure based control, lighting, 400 V / 230 V / 42 kW

OPERATION

continued attendance, possibility of remote control from control centre and PC visualization by request

CONTAINER - 1 pc

thermally uninsulated, blue color, possibility of own heating with own warm-air furnace, dimensions: length 9,35 till 10 m - width 2,85 m - height 4,75 m, at the transport 3,7 m

SMOKE STACK

smoke stack DN 500 or 600 mm, 3 component stack ( stainless steel - heat insulation - aluminum ), high according at need up until 40 m, eventually steel self contained, approximately like high

BOILER

there is 1 pc of a steam boiler - KAH - BK 8,0 T 80 – with power 8 000 kg steam / hour

DOCUMENTATION

inspection books and proposed operating and maintenance rules are supplied with the boiler room


TECHNICAL CONDITIONS

GAS

gas inlet approximately 90 - 100 kPa

CONDENSATE

return rate over 50%, temperature over 80°C

SLUDGE BLOW-OFF

automatic, eventually manual operation

CUSTOMER REQUIREMENTS

INQUIRY

in case you are interested in our services, send us a written inquiry - questionnaire for mobile boiler rooms CONUS

BASE

useful base has to be prepared hard but is it not necessary exactly level surface for our containers with weight approx. 5 till 30 tons - a standard hard level surface is adequate eventually only a concrete, an asphalt, a garth or panels, ties, concrete footing, etc. - it is not necessary a field engineering and it is saving of costs compared to past or to other containers

TRANSPORT

we solving a transport and unloading of the boiler room, eventually a customer after the agreement

MEDIA

gas, heating medium, water and power connections to be solved by the customer, eventually we after the agreement

OTHER INFORMATION

RENTALS

have to be agreed individually according to the current usage of rented boiler rooms in the given period

SERVICE

in the Slovak Republic and in the Czech Republic provided by CONUS Group, abroad provided by contractual partners

DELIVERY TIME

16 – 20 weeks 

PROJECT DOCUMENTATION

we provide an orientation project documentation for location of mobil boiler room in the event of interest