STANDARD EQUIPMENT OF MOBIL BOILER ROOMS CONUS - OIL STEAM
HEATING PART
safety elements, steam fittings, max. operating pressure of 8 bar
WATER PART
chemical water treatment, automatic dosing, feed tank and pumps, fittings, max. operating pressure of 10 bar
FUEL PART
oil storage - twin-shell tanks, oil supply to the burner, fuel emergency lock, fittings
ELECTRICAL PART
steam pressure based control, lighting, grounding, boiler rooms up to 600 kW - 230 V / 5 kW, boiler rooms over
600 kW - 380 V / 10 kW
OPERATION
sporadic attendance within 24 hours, information on emergency conditions sent via GSM, possibility of remote PC visualization
CONTAINER - 1 pcthermally insulated, include a floor, rigid structure with stability for broken terrain, the tonnage is 26 tons, a floor is from laminated bamboo-wood or from steel with nonskud surface, blue color, a stacking 8 pcs, a length from 2 till 13 m, a width from 2 till 3 m, a height from 2 to 3,5 m, the best quality of lacker in worldmarket, fire resistence
SMOKE STACK
4 meter high, self supporting, 3 component stack (stainless steel - heat insulation - aluminum)
BOILERS
there are different types of steam boilers or steam generators, you can find here
DOCUMENTATION
inspection books and proposed operating and maintenance rules are supplied with the boiler room
TECHNICAL CONDITIONS
CONDENSATE
return rate over 50%, temperature over 80°C
SLUDGE BLOW-OFF
automatic operation
SLAG DRAINAGE
automatic operation
WATER
water hardness for the chemical water treatment max 20°d (German grade)
CUSTOMER REQUIREMENTS
INQUIRY
in case you are interested in our services, send us a written inquiry - questionnaire for mobile boiler rooms CONUS
BASE
useful base has to be prepared hard but is it not necessary exactly level surface for our containers with weight approx. 5 till 30 tons - a standard hard level surface is adequate eventually only a concrete, an asphalt, a garth or panels, ties, concrete footing, etc. - it is not necessary a field engineering and it is saving of costs compared to past or to other containers
TRANSPORT
we solving a transport and unloading of the boiler room, eventually a customer after the agreement
MEDIA
oil, heating medium, water and power connections to be solved by the customer, eventually we after the agreement
OTHER INFORMATION
RENTALS
have to be agreed individually according to the current usage of rented boiler rooms in the given period
SERVICE
in the Slovak Republic and in the Czech Republic provided by CONUS Group, abroad provided by contractual partners
DELIVERY TIME
12 – 16 weeks – steam generators: BOSCH, CERTUSS, GARIONI NAVAL, CLAYTON, THERMINDUS
16 – 20 weeks – steam-boilers: BOSCH, KU
PROJECT DOCUMENTATION
we provide an orientation project documentation for location of mobil boiler room in the event of interest